Installing the U-bolt and Handlebar Base

  1. Place the U-bolt Call-out number one around the handlebar Call-out number two, and thread the ends through the handlebar base Call-out number three.


  2. Tighten the nuts to secure the base.
    NOTE: The recommended torque is 50 lbf-in (5.65 N-m). Do not exceed torque of 80 lbf-in (9.04 N-m).
Copyright © Garmin. All rights reserved.GUID-29F01505-8BFA-4D12-A2FA-E78E3D09FE96 v4