Installing the U-bolt and Handlebar Base

  1. Place the U-bolt Callout number one around the handlebar Callout number two, and thread the ends through the handlebar base Callout number three.


  2. Tighten the nuts to secure the base.
    NOTE: The recommended torque is 50 lbf-in (5.65 N-m). Do not exceed torque of 80 lbf-in (9.04 N-m).
Copyright © Garmin. All rights reserved.GUID-FAE55CF6-F172-425A-8C39-D456CF16E200 v6