Reconnecting the Upper Link to the Mount Base

  1. Place the plastic bushings Callout number one over the bolts Callout number two you removed with the original upper link, or over the two bolts supplied with the replacement upper link.

    Connecting upper link to the mount base with callouts
  2. Place a plastic washer Callout number three that you removed with the original upper link or a washer supplied with the replacement upper link between the upper link and the mount base.
    NOTE: Replacement plastic washers may have adhesive on one side. If your washers have adhesive, you can stick them to the mount base to make installing the bolts easier.
  3. Push one of the bolts with a plastic bushing through the upper link and washer, and using an 8 mm hex bit or wrench, screw it into the mount base.
  4. Repeat the previous step on the other side of the mount.
  5. Tighten the bolts to 55 Nm (40.5 lbf-ft.).
Copyright © Garmin. All rights reserved.GUID-F61CDD86-17CE-4801-B775-07A31282A541 v2